







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Pinewood
Adding room to a home in Pinewood usually means opening a wall that has stood since the 1950s or 1960s and finding out what’s inside. That’s the reality on these tight 50-foot lots, where concrete-block houses have survived decades of Miami-Dade sun and hurricane seasons. We plan for it. Before anyone quotes a number, we look at the existing structure, put the hidden conditions in writing as allowances, and price any surprise in a signed change order before the next block goes down. A home addition in Pinewood runs $45,000 – $130,000, and a detached ADU runs $90,000 – $220,000. Call (844) 320-5198 and we’ll walk your property and give you a flat written price.
Why Rowan Construction Group Miami Gardens Is Pinewood’s Preferred Home Additions & ADU Company

Pinewood sits in ZIP 33167, a historically Black community in northwest Miami-Dade that was built out by the 1960s and 70s. Most of the housing stock is concrete-block single-family homes with flat or low-pitch roofs, original jalousie or single-pane windows, and carports. That shapes how we approach every job here: additions and second stories have to tie into 50-plus-year-old CMU walls, and those walls rarely meet current Miami-Dade wind-loading code without reinforcing.
We work under The Haven Standard, which means a written flat price and written scope before work begins, a signed change order before any change proceeds, and a documented photo record on every visit. On 4,000-plus projects since 2007, that discipline has kept costs within a few percent of the agreed number. Pinewood customers read the three-star reviews and want to see the price on the page before they call. We understand that, so the pricing is right there. Our technicians have up to 19 years of experience, and every crew member is background-checked and uniformed.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Pinewood
ADU Design & Permitting
An accessory dwelling unit, or ADU, is a secondary living space on the same lot, and it needs its own design set and permits. In Pinewood, that means working within Miami-Dade’s setback rules while matching the scale of a neighborhood built out in the 1960s and 70s. We handle the drawings, the permit package, and the inspections, and we write every allowance for hidden conditions into the contract before the first signature.

Garage Conversion ADU
A garage conversion is the fastest path to an ADU on a Pinewood lot, and it runs $30,000 – $80,000. Converting the carport or garage means upgrading electrical to current code, adding waterproofing where the flat roof meets the wall, and tying the new living space into the existing structure. Because these garages were often built on shallow footings, we inspect before we quote.

New Detached ADU
A new detached ADU is a standalone structure, and it runs $90,000 – $220,000 in Pinewood. On a tight 50-foot lot, the site plan is the hard part: setbacks, drainage, and utility runs all have to fit. We use Cambridge Pavers and Quikrete for the hardscape and foundation work and specify impact glazing and wind-rated roofing to match Miami-Dade hurricane code.

Junior ADU & Interior Conversion
A junior ADU is a smaller interior unit carved out of existing square footage, often a converted den or a portion of the main house. It’s a practical option on Pinewood properties where a detached structure won’t fit. We plan the rough-in and framing inspection sign-offs early so the punch list doesn’t stall the draw schedule. Curious how this fits the bigger picture? See our Home Additions & ADU hub.
Trusted Brands We Service in Pinewood
Our sourcing runs across fifty-plus vetted material brands, and we bring the honest number to the quote because of it. On Pinewood addition and ADU projects, you’ll see Cambridge Pavers on the hardscape, Quikrete and Sakrete mixes for concrete and CMU work, and Oldcastle products where masonry specs call for them. We don’t stock parts locally or run a warehouse, so we specify the right product for the job and coordinate delivery to the site. That keeps the written price grounded in real material costs rather than padded estimates.
Common Home Additions & ADU Problems We See in Pinewood Homes
- Unreinforced concrete-block walls. Many Pinewood homes built from the 1950s through the 70s have CMU walls without reinforcing steel or bond beams. Opening up an addition often exposes this, and it forces a structural retrofit that wasn’t in the original scope.
- Failed waterproofing at flat roofs and jalousie openings. Flat-roof-to-wall junctions and the original jalousie window frames are where water gets in. The leak usually shows up only after demolition, not before.
- Outdated ungrounded wiring. Two-wire, ungrounded electrical and early NM cable are common once walls open. Bringing them to current code adds weeks and needs a change order approved before we proceed.
- Storm-season scheduling pressure. Pinewood’s June-to-November hurricane season and summer afternoon storms push concrete and roofing work around weather windows, and post-storm inspection and insurance demand can spike fast.
See the difference
Before
After
Before
After
Before
AfterPricing for Home Additions & ADU in Pinewood, FL

Here’s what these projects actually cost in the Pinewood market. A home addition runs $45,000 – $130,000, a detached ADU runs $90,000 – $220,000, and a garage conversion runs $30,000 – $80,000. Those ranges include a written scope and written warranty; the flat price is what you compare. What moves the number up or down is the condition of the existing structure. If we find unreinforced block walls or failed waterproofing, that gets priced in a signed change order before we keep going, never buried in a final bill. Call (844) 320-5198 for a free estimate, and bring a competitor’s written quote for a free line-by-line second opinion.
| Line Item | Price Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
One paragraph on this page could only apply to Pinewood. Because these 1950s-1970s block homes sit on tight 50-foot lots, an addition or second story has to be engineered to tie into 50-plus-year-old CMU walls that rarely meet current Miami-Dade wind-loading code. That often means reinforced bond beams or new shear walls before the first new block is laid. It’s the kind of condition that changes an estimate, and we name it up front. On a typical Pinewood addition, the walls come open to reveal original jalousie framing with no continuous load path, undersized headers over carport openings, and sometimes early wiring that fails inspection. A qualified local general contractor inspects the existing structure first, writes allowances for hidden framing, wiring, and waterproofing into the contract, prices any surprise in a change order before work continues, and schedules the rough-in and framing inspection sign-offs so the punch list doesn’t stall the draw schedule.
We Also Serve Cities Near Pinewood
We take on additions and ADUs across the neighboring communities too: Westview, Gladeview, West Little River, and Miami Shores. The same aging block homes and tight-lot conditions show up throughout, so the approach carries over. If you’re just outside Pinewood’s borders, visit our Pinewood area page to see what we handle locally.
Serving Pinewood, FL – Our Local Coverage Area
We serve Pinewood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Pinewood

Because the initial number can’t see inside 50-year-old walls until demolition starts. When we open a Pinewood home, we often find unreinforced block, no continuous load path, or ungrounded wiring. We price each surprise in a signed change order before work continues so it can’t climb quietly. Call (844) 320-5198 for an estimate that plans for the usual hidden conditions up front.
Usually yes, but only after a structural inspection. A 1960s CMU wall in Pinewood often needs reinforced bond beams or new shear walls to carry a second story under current Miami-Dade wind-loading code. We engineer to the existing structure, not around it. Call (844) 320-5198 to schedule a walk-through and a written scope.
An addition or ADU in Pinewood requires a building permit through Miami-Dade, including structural, electrical, and wind-loading review, plus inspections at set stages. We assemble the permit package and coordinate the sign-offs. Call (844) 320-5198 and we’ll explain what the permit triggers once walls are open on your property.
We stop, document the condition, and price it in a written change order before any work continues. You see the photo record and the number, and nothing proceeds until you sign. Under Clause 1 of The Haven Standard, the price is written before anyone picks up a tool, and signed change orders keep surprises from becoming final-bill surprises. Call (844) 320-5198 for a free estimate.
A home addition in Pinewood runs $45,000 – $130,000, a detached ADU runs $90,000 – $220,000, and a garage conversion runs $30,000 – $80,000. What pushes a job toward the top of the range is the condition of the existing block walls, wiring, and waterproofing. Call (844) 320-5198 for a flat written price with a written scope and a written warranty.
Get a Written Price Before Any Work Starts
Adding a room or building an ADU in Pinewood takes planning, a permit package, and a budget that holds together when a 60-year-old wall turns out to need reinforcing. Our crews are background-checked and uniformed, a live person answers calls 24/7, and every visit includes a documented photo record as standard. A written price and written scope come before work starts, and the 365-Day Done Right Promise backs what we build. Call (844) 320-5198 to schedule your free estimate, and have a competitor’s written quote ready for a free second opinion.
Written by the team at Rowan Construction Group.












