







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterFull Bathroom Remodeling in Miami Gardens, FL
A full bathroom remodel in Miami Gardens typically runs $14,000 to $32,000 for a standard hall or guest bath and $28,000 to $58,000 for a primary suite, depending on how far the layout changes and what the walls hide behind the tile. A true full remodel means the room comes down to the studs: new supply lines and drain rough-in, new waterproofing, new substrate, new fixtures, new finish surfaces. It is not a cosmetic refresh. If you are replacing a vanity and a tile floor in a house built in the 1960s or 1970s, you are almost always opening walls, and that is where the price gets decided.
Rowan Construction Group Miami Gardens handles full bathroom remodeling as one of seven residential trades, and we quote it the way we quote all of them: a flat written price with a written scope before anyone picks up a tool. Our technicians have up to 19 years of experience, and every crew member is background-checked and arrives in uniform. If you want to start with the broader picture of what a bath project involves, Bathroom Remodeling in Miami Gardens covers the trade in full; this page is about the down-to-the-studs version. Call (844) 320-5198 for a free estimate.
Key Takeaways
- Full remodels in Miami Gardens commonly land between $14,000 and $58,000, driven mostly by layout changes and what the rough-in reveals.
- We deliver a written price and written scope before work starts, and no change proceeds without your signature – Clause 1 of The Haven Standard.
- Every visit includes a documented photo record as a standard deliverable, so you can see the substrate and the waterproofing before tile goes over them.
- The 365-Day Done Right Promise backs the finished room: if it is not done right, we make it right.
- Calls are answered by a live person 24/7, and the license number sits on the page.

When You Need Full Bathroom Remodeling
A full remodel is the right call when the problems are behind the surface, not on it. These are the scenarios we walk into most often in Miami Gardens:
- The shower pan fails and water reaches the framing. In homes around the 1950s-1970s blocks of Miami Gardens, we regularly find original mortar-bed pans that have been leaking slowly for years. The tile looks intact. The studs behind it are soft. That is a full remodel, not a regrout.
- Cast iron or galvanized plumbing is at the end of its life. Gray water in the tub, rusty threads at the valve bodies, a drain that has been snaked repeatedly – if the pipes are opened up for any reason, replacing the rough-in while the walls are already open costs far less than coming back to it later.
- The layout does not work for the household. A 5-by-8 hall bath with a tub nobody uses, a primary with a single sink and a closet eating the wall – moving a wall or swapping a tub for a walk-in shower is a full remodel by definition.
- Mold or moisture damage keeps coming back. Miami Gardens humidity is unforgiving. A bath with no exhaust fan, or one venting into the attic instead of outside, will grow mold on the ceiling and behind the drywall no matter how often it is cleaned. The fix is mechanical and structural, not a coat of paint.
- You are bringing an older home up to a safe standard. Grab bars blocked in properly, a curbless shower with the slope built correctly, GFCI protection at every receptacle, an ADA-height toilet – these are planned at the framing stage. Retrofitting them later means tearing out the finish twice.
- A previous remodel is failing under the finish. We see this in flip renovations from the last decade: cement board screwed directly to greenboard, no waterproofing membrane at the corners, tile set over unprimed drywall. The room has to come apart to be made right.
If your situation is smaller – a vanity swap, a tile surround, a fixture update – start with our Bathroom Remodeling overview before assuming you need the full scope. The number in writing will tell you which one you actually need.
Our Full Bathroom Remodeling Process
Every full remodel follows the same sequence. The steps do not change; the material choices and the surprises inside the walls do.
- Walkthrough and written scope. We measure the room, photograph the existing conditions, and identify what will and will not move. You receive a flat written price and a written scope before we schedule a single day. No work proceeds on a change until the change order is signed.
- Demolition and discovery. The room comes down to the studs. We document what we find – the condition of the framing, the drain lines, the subfloor, any hidden water damage – in the photo record. If the discovery changes the scope, you get the number before anyone continues. That is the administrative discipline the 365-Day Done Right Promise rests on.
- Rough-in and inspection. New supply and drain lines, new electrical with GFCI protection, exhaust fan ducted to the exterior, and blocking in the walls for grab bars and a future seat. The rough-in is inspected before anything closes up. A full bath lives or dies on this stage.
- Waterproofing and substrate. A proper waterproofing membrane over cement board or a bonded sheet membrane, with the pan sloped to the drain and the corners taped and sealed. We photograph the membrane before tile goes on, because once it is covered, no one can verify it. This is the single most important step in the entire job.
- Tile, fixtures, and finish. Floor and wall tile, grout and sealant, the vanity and countertop, the toilet, the glass enclosure, the trim and paint. Brands run through the fixture and glass lines – Kohler and Toto for the ceramics, and glass supplied through fabricators we work with. Every one of these is named in the written scope before the job starts.
- Final walkthrough and documentation. We walk the finished room with you, hand over the written warranty, and deliver the full photo record. If anything is off in the first 365 days, the Done Right Promise applies – we come back and make it right.
If you are comparing quotes and want a second set of eyes before you sign, our home page explains how we handle estimates across all seven trades. And if the bath project is part of a larger renovation, our teams also handle Kitchen Remodeling in Miami Gardens and Home Additions in Miami Gardens under the same written-price discipline.

Full Bathroom Remodeling Pricing in Miami Gardens
Here is what the numbers actually look like. These are ranges, not promises – your written quote is the number that counts – and they reflect the Miami Gardens market for a down-to-the-studs remodel with new rough-in, new waterproofing, and new finish.
| Line item | Typical range | What drives it |
|---|---|---|
| Hall or guest bath, full remodel | $14,000 – $32,000 | Size, tile grade, whether plumbing moves |
| Primary suite, full remodel | $28,000 – $58,000 | Dual vanity, walk-in shower, tub, square footage |
| Rough plumbing replacement | $2,500 – $6,500 | Cast iron or galvanized to PEX and PVC, length of run |
| Waterproofing membrane and pan | $900 – $2,200 | Shower size, curb vs. curbless, seat |
| Tile, labor and material | $3,500 – $9,000 | Porcelain vs. natural stone, layout, large format |
| Vanity, countertop, and fixtures | $1,800 – $7,500 | Brand tier, single vs. double, cabinet grade |
| Glass shower enclosure | $900 – $2,800 | Frameless vs. semi-frameless, custom panel sizes |
| Electrical and exhaust | $800 – $2,000 | GFCI, fan ducted to exterior, lighting |
What pushes the price up
Two things move a Miami Gardens full bath more than anything else: moving plumbing and what the walls reveal. Relocating a drain or a supply stack can add several thousand dollars because it changes the framing and the subfloor. Hidden water damage – the kind that shows up in a 1960s home after forty years of a slow shower pan leak – is the wildcard, and it is exactly why we inspect before we quote the finish. That inspection is why the written number holds.
Material choice is the other lever. Tile from a big-box line and porcelain from a specialty showroom can differ by thousands across a full bath. We source across fifty-plus vetted brands, which means the written quote reflects honest costs rather than inflated allowances. The estimate is free, the price is flat, and if you have a competing written estimate we will review it line by line at no charge as a Free Second Opinion.
FAQs – Full Bathroom Remodeling
How much does a full bathroom remodel cost in Miami Gardens?
A full bathroom remodel in Miami Gardens typically costs $14,000 to $32,000 for a hall or guest bath and $28,000 to $58,000 for a primary suite, depending on layout changes, tile selection, and whether the plumbing rough-in needs replacement. The written quote you receive is the number that matters, and it is flat – not an estimate that balloons once work starts. Call (844) 320-5198 for an exact written price; the estimate is free.
How long does a full bathroom remodel take?
A full bathroom remodel usually takes three to five weeks from demolition to final walkthrough, with the longest single stage being tile and waterproofing cure time. Small baths with no layout changes can finish closer to three weeks; primary suites with plumbing relocation and custom glass often run toward five. You get the schedule in writing before the first day, and any change to it comes with a signed change order.
Do I need to move out during the remodel?
You do not need to move out for a hall or guest bath remodel, but a primary suite remodel is harder to live through because it removes the household’s main bathroom. Most Miami Gardens homeowners plan around a second bath for the duration. We discuss the logistics during the walkthrough and sequence the work to minimize the days the room is unusable. Call (844) 320-5198 to talk through your specific layout.
Can you remodel my bathroom in Miami Gardens the same week I call?
We cannot promise a same-week start for a full remodel – demolition and rough-in need a scheduled crew and, in most cases, permit review – but we can get a written estimate to you quickly and put you on the schedule as soon as the scope is signed. Calls are answered by a live person 24/7. Call (844) 320-5198 for a free estimate and a realistic start date.
Is it cheaper to repair or replace a failing bathroom?
It is usually cheaper to repair when the damage is a single failed fixture or a localized tile issue, and cheaper to replace the full room when the shower pan or the plumbing rough-in has failed. The deciding factor is whether the waterproofing and the pipes behind the finish are compromised. For a Miami Gardens home of a certain age with a leaking pan, a spot repair generally just delays the full remodel and doubles the cost. The written estimate will tell you which one you need.
Do you provide a warranty on a full bathroom remodel?
Yes. The 365-Day Done Right Promise covers the finished room: if it is not done right, we make it right within that window, backed by The Haven Standard. The warranty is written into your scope, not buried in fine print. Call (844) 320-5198 for details on how the promise applies to your project.
Ready to Get a Written Price in Miami Gardens?
A full bathroom remodel is the kind of project where the number in writing at the start is the only thing that keeps the price honest at the end. We photograph what we find, we quote a flat price with a written scope, and we do not touch a change until the change order is signed. If you are considering a remodel in Miami Gardens and want to see the real numbers before you commit, call (844) 320-5198 for a free estimate – a free second opinion on any competitor’s written quote, reviewed line by line, comes at no charge too.
Written by the team at Rowan Construction Group Miami Gardens, serving Miami Gardens.


